1、测力传感器采用穿孔式固定安装安装。将传感器安装锚杆的托盘和紧固螺母之间,传感器安装时要注意居中,偏离中心安装时会造成一定的测量误差。建议传感器在巷道掘进过程中安散艉九慊装,若在回采巷道锚杆上安装传感器时,要注意局部顶板安全。The force transducer is installed with a perforated fixed installation.Install the sensor on the anchor tray and tighten the screw.When the sensor is installed between the mother and the mother, the center should be taken care of, and the deviation from the center will cause a certain measurement error.It is suggested that the sensor should be installed in the roadway tunneling process. If the sensor is installed on the roadway bolt, please note.Local roof safety.

KJ616 钻孔应力监测系统安装调试方法

2、 先放入托盘,将传感器穿入锚杆或锚索中,保持传感器居中,旋紧锚杆的紧固螺母。若是锚索用涨拉机将锚索涨紧。安装方法如图1 所示。1) Put the sensor into the anchor or anchor cable, and keep the sensor centered and tighten the bolt.Tighten the nut.If the anchor cable is used to lift the anchor cable up.The installation method is shown in figure 1.

KJ616 钻孔应力监测系统安装调试方法

3、 按照图 2 的接线方式,将传感器信号线与KJ616-F 矿用数据通讯分站总线上三通接线盒相连,电缆线按颜色一一对应连接。2) According to the wiring mode of figure 2, the sensor signal line and the kj616-f mining data communication station bus are used.Connect the three junction box, and the cable is connected by color.

KJ616 钻孔应力监测系统安装调试方法

4、调试检查 KJ616-F 矿用数据传输分站与传感器的连接电缆无误后,接通电源,等分站进入运行状态。观察显示器应显示如下信息:1) 显示系统的版本信息,延时进入工作状态。2) 巡测传感器后,显示当前传感器的数据。DebuggingCheck the connection cable of the kj616-f mining data transmission station with the sensor, then connect the power, etc.The sub-station enters the running state.The monitor should display the following information:1) display the version information of the system, and the delay will enter the working state.2) after inspecting the sensor, the data of the current sensor is displayed.